Refurbishment & Restoration

A methodical approach and refurbishment do not always go hand in hand.  Inevitably support at each corner and all areas in between may initially seem the right approach, however, it is never that easy.  By its very nature restoration is about exploration and execution. AGS try to simply tackle this problem by learning very quickly, adapting and using a method that really is suitable for their client’s complex needs.  Applying this principal to all their refurbishment projects has elevated AGS to their client’s primary choice for complex restoration.

Scaffolding/RefurbishmentCASE STUDY

Download Here
Download Here
Case Study
The Savoy Hotel
   

Location: Strand, London WC2   

Client: Chorus Group Ltd

From the moment that AGS Scaffolding receive their order from Chorus our project team have ensured that the job is properly engineered and structured thought out. AGS have made sure that all the access, protection and lifting requirements that Chorus demand are catered for, and often exceeded. This is a large and complex project where a close working relationship with their client is required, where the needs of other specialist contractors have to be taken into account, where adaptability is the key and where AGS scaffolding have successfully and safely delivered all that is expected within such an intricate contract.

"Our priority was to get the logistics moving quickly and correctly from the off. AGS played a critical part in this operation with the requirement for engineered gantries & scaffolding. From day 1 they have been co-operative and attentive towards their programme of install and Health & Safety issues."
Dave Williamson, Project Manager, Chorus Group Ltd